April 11, 2011

Progress in refitting the port aft berth

Here are some photos depicting progress that's been made in the aft berth, after Barry had finished replacing the horizontal 3/4" plywood board that was rotten. Barry put up insulation, measured and cut 1/4" plywood which I painted with the PermaWhite (tinted winter white). And I painted the horizontal surface, and floor too (around the holly-and-teak floorboard that's supposed to be there (except in this berth, even that's too rot-damaged to use, though it's okay-to-good elsewhere in the boat)). Then he put up those boards as vertical walls on both sides, and started hanging hardware to create storage. He's still got to finish fixing the vertical wall at the very back ... But certainly this is great progress already.

No comments:

Post a Comment